SINTAR distributor · Uzbekistan+998 90 006 55 30

INSTALLATION AND MAINTENANCE

Built correctly.
Ready for life.

Work sequence, key details and handover checks. Always use instructions specific to the selected product and roof design.

SINTAR installation film · 4:49 · English narration. Video plays on this website. Details and dimensions refer to the illustrated RESERVE system.

01

Prepare the roof

Check structure, waterproofing, falls and outlets. Account for temporary installation loads.

02

Root barrier and protection

Maintain continuous root protection, then lay protection geotextile. Complete joints and upstands.

03

Edge profiles

Form planting edges and junctions. Fixings must not damage waterproofing.

04

Drainage membrane

For RESERVE, open cells face upwards. Follow the product instructions for joints and cutting.

05

Filter layer

Lay the separate filter over drainage, cover joints and turn it up at profiles. Repair damage before covering.

06

Gravel, substrate and plants

Maintain protective gravel strips and access to outlets. Install substrate and planting to the design.

07

Inspection and handover

Inspect drainage and connections. Hand over concealed-work photos, documents and a maintenance plan.

Small details. Big responsibility.

01

Roof outlet

Do not cover outlets with substrate. Keep the inspection box accessible and the water path open.

02

Parapets and penetrations

Maintain waterproofing and root protection continuity. Upstands and joints follow the design and product instructions.

03

Planting edge

The profile retains substrate. Match its height to the final level and maintain drainage paths.

04

Filter joints

Repair tears and open joints before placing substrate. Confirm repair methods with the supplier.

Roof outlet

Roof outlet

Do not cover outlets with substrate. Keep the inspection box accessible and the water path open.

Planting edge

Planting edge

The profile retains substrate. Match its height to the final level and maintain drainage paths.

Explanatory schematic, not a construction drawing. Layer thicknesses are not to scale. SINTAR / RESERVE.

Before handover

A self-check list; it does not replace formal acceptance records.

0 / 7

A living roof needs ongoing care.

Check plant establishment, remove unwanted vegetation and clean outlets. Plan irrigation and maintenance for the plants, season and local weather. A water-storage layer does not eliminate the need for irrigation.

WHERE TO BUY

Start with your rooftop.

Tell us about the project. We will help select a system and confirm materials, price and supply lead times.

+998 90 006 55 30Message on Telegram

Tell us about your project

Your enquiry will be sent to info@rksgroup.uz. By pressing the button, you submit your name, contact and project description for us to handle your enquiry.

Message on TelegramTelegram

Tell us about your project

Your enquiry will be sent to info@rksgroup.uz. By pressing the button, you submit your name, contact and project description for us to handle your enquiry.